Drag to turn · scroll to zoom

First start-up

Before you switch on

The manual's checks and tank filling, with one step from Clive Coffee.

  1. Look under the machine for shipping wing nuts and take them out (Clive Coffee: some batches have two; left in, the pump rattles). The manual does not mention them.
  2. Check the machine is off (green lamp not lit) and the plug is out.
  3. Check the drip tray is in and both joysticks are closed, on a level, water-resistant surface.
  4. Open the cup warming tray.
  5. Lift out the tank, rinse it well and fill it with soft water (what water).
  6. Put it back in its guides and close the tray.

Fill mode and the first heat-up

The manual's steps, on the tank.

  1. Plug in and switch on. The green lamp lights and the display shows "Fill".
  2. Put a small jug under the group.
  3. Lift the brew lever and let water run for at least 30 seconds, until it flows from the group.
  4. Lower the lever. "Fill" should go from the display.
  5. Wait while the steam boiler fills by itself. When the pump goes quiet it is done; refill the tank if it runs low and the machine shuts off.
  6. Before the first coffee, rinse 2 to 3 tanks of water through the group and the hot-water wand.

The machine heats the coffee boiler and group first, then the steam boiler. The group is hot in about 6 to 7 minutes.

Running it on mains water

The manual says installation should be done by a qualified specialist. Its steps:

  1. Have a pressure regulator and an accessible shut-off valve on the supply, set to 1 to 2 bar.
  2. Connect the supplied metal hose to the nozzle in the rear of the base plate.
  3. Turn the rotary valve under the machine away from the connection nozzle.
  4. In the menu, set Advanced User Settings to ON, then Tank Mode to OFF (advanced settings).
  5. Do the Fill mode as for the tank.
  6. Rinse 5 to 8 litres through the group and the hot-water wand before the first coffee.

Close the shut-off valve whenever the machine is not in use, unless you use the timer. To go back to the tank: valve towards the nozzle, Tank Mode ON.

ECM Synchronika II: every job