Drag to turn · scroll to zoom

Probes and sensors

Probes, safety thermostats and the brew switch

ECM's manual says any repair or change of components must be carried out by an authorised specialist dealer, using only original spare parts; otherwise ECM accepts no liability. Treat this as dealer work.

Clean the level probe

Clive Coffee's method, for the original Synchronika; the II's probe has the same ECM number.

  1. Unplug, let it cool, and take the panels off.
  2. Pull the wire off the probe.
  3. Unscrew the whole probe assembly with a 19 mm spanner.
  4. Clean the probe with steel wool or a brush.
  5. Wrap the thread in PTFE tape and refit it without over-tightening. Push the probe fully down and tighten the upper nut with a 13 mm spanner.
  6. Purge: machine off, hot-water lever fully open over a large jug, switch on; when water flows, draw 240 to 350 ml, close, and let it refill.

ECM Synchronika II: every job