Close-up
Drag to turn · scroll to zoom
Take the panels off
Take the top panel off
This follows a retailer's published method. It is enough for jobs at the top of the machine: the level probe, the valves on the steam boiler, the overpressure valve, the steam tap stem and the thermostats.
- Unplug and let the machine go cold.
- Remove the tank lid and lift the tank out. This exposes three Torx T20 screws.
- Remove the screw on the left side. Only loosen the two facing the front.
- Lift the top panel up and towards the front.
Take the outer panel off
The same retailer's method, continued. Do the top panel first.
- Lay the machine on its back.
- Remove the 3 Phillips screws that hold the panels to the frame.
- Remove the 2 Phillips screws that join the wrap-around outer panel to the front panel.
- Slide the outer panel off towards the back.
- Remove the reservoir tray: 4 Phillips screws.
None of these screws is modelled, and the retailer gives no Phillips size. Lelit's diagram lists Torx T20 screws for the back body and cross-head M4 screws for the front panel, so have both drivers to hand.