Close-up
Drag to turn · scroll to zoom
Boiler and heater seals
Boiler and heating element seals
This is dealer work. The boiler has to be drained, the wiring disconnected and the joint pressure-tested afterwards.
The boiler is clamped to the brew group by six socket cap screws, with a gasket (P2042.2) between them. The heating element passes through the top of the boiler on two more gaskets (P2042.5).